Quality Technology and Quantitative Management

Quality Technology and Quantitative Management

QUAL TECHNOL QUANT M
影响因子:3
是否综述期刊:
是否预警:不在预警名单内
是否OA:
出版国家/地区:TAIWAN
出版社:Taylor and Francis Ltd.
发刊时间:2004
发刊频率:
收录数据库:SCIE/Scopus收录
ISSN:1684-3703

期刊介绍

Quality Technology and Quantitative Management is an international refereed journal publishing original work in quality, reliability, queuing service systems, applied statistics (including methodology, data analysis, simulation), and their applications in business and industrial management. The journal publishes both theoretical and applied research articles using statistical methods or presenting new results, which solve or have the potential to solve real-world management problems.
质量技术和定量管理是一个国际参考期刊出版的原始工作在质量,可靠性,排队服务系统,应用统计学(包括方法学,数据分析,模拟),及其在商业和工业管理中的应用。该杂志发表理论和应用研究文章,使用统计方法或提出新的结果,解决或有潜力解决现实世界的管理问题。
年发文量 42
国人发稿量 17.77
国人发文占比 0.42%
自引率 -
平均录取率0
平均审稿周期 >12周,或约稿
版面费 -
偏重研究方向 ENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
期刊官网 http://www.tandfonline.com/toc/ttqm20/current
投稿链接 https://www.editorialmanager.com/TTQM

期刊高被引文献

A closed-form moment estimator for the vector multiplicative error model and its application
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389143
A computationally efficient self-starting scheme to monitor general linear profiles with abrupt changes
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1396956
A limited clearing queueing model with an orbit and non-persistent customers
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1396955
A profile monitoring of the multi-stage process
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1447282
A re-evaluation of the run rules xbar chart when the process parameters are unknown
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1513826
Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1460908
Optimal performance of the variable sample sizes Hotelling’s T2 control chart in the presence of measurement errors
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1490474
Run length properties of run rules EWMA chart using integral equations
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1372853
Analysis of a single server batch arrival unreliable queue with balking and general retrial time
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1510359
A variable sample size and sampling interval control chart for monitoring the process mean using auxiliary information
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1430523
Equilibrium balking strategies in Markovian queues with a single working vacation and vacation interruption
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1429805
Partial accelerated degradation test plans for Wiener degradation processes
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1368968
Bibliometric analysis for process capability research
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1464426
Residual life prediction for complex systems with multi-phase degradation by ARMA-filtered hidden Markov model
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1335496
Some theoretical comments regarding the run-length properties of the synthetic and runs-rules monitoring schemes – part 1: zero-state
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389141
Determining optimal process mean and quality improvement in a profit-maximization supply chain model
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389124
M/M/c balking retrial queue with vacation
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1365280
Optimal periodic replacement policy for a GPP repairable product under the free-repair warranty
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1422218
An efficient subset selection method for supplier selection under multiple quality characteristics
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389145
Design of control charts for multivariate Poisson distribution using generalized multiple dependent state sampling
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1497935
Generating evenly distributed nondominated solutions in dual response surface optimization
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1372053
Monitoring and control of beta-distributed multistage production processes
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1335495
An M/G/1 retrial queue with balking customers and Bernoulli working vacation interruption
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1480264
Comparisons of site-clearing and non-site-clearing Markovian queues with server failures and unreliable repairer
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389144
Availability analysis and maintenance modelling for inspected Markov systems with down time threshold
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1465228
A robust multivariate sign control chart for detecting shifts in covariance matrix under the elliptical directions distributions
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1372852
Socio-economic design of control charts for monitoring service processes: a case study of a restaurant system
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1519880
Optimal definition of the limit of detection (LOD) in detecting genetically modified grains from heterogeneous grain lots
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1347992
Some theoretical comments regarding the run-length properties of the synthetic and runs-rules monitoring schemes – part 2: steady-state
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1389142
Information visualization about changes of process mean and variance on (¯x, s) control chart
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1466410
Mixed equilibrium and social joining strategies in Markovian queues with Bernoulli-schedule-controlled vacation and vacation interruption
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1480266
A targeted Bayesian network learning for classification
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1395109
An analytical closed-form solution for multiple line supplier selection problem
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1430522
An optimal maintenance policy for a k-out-of-n system without monitoring component failures
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1383550
Statistical effects of waterway lock unavailability on commodity flow
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1542964
Calculating confidence intervals for percentiles of accelerated life tests with subsampling
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1448693
Post-warranty maintenance optimization for products with deterioration depending on aging and shock
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1509431
An effective online data monitoring and saving strategy for large-scale climate simulations
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1414112
Service quality variation monitoring using the interquartile range control chart
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1519921
Statistical regression models for WCET estimation
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1399971
On estimation of overlapping measures for exponential populations under progressive first failure censoring
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1481806
Bayesian analysis of compound Poisson process with change-point
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1399511
Corrigendum
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1394518
Reliability interval for a stochastic project network constrained by budget and time
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2017.1369651
Stochastic lead time with order crossover
来源期刊:Quality Technology & Quantitative ManagementDOI:10.1080/16843703.2018.1483220

质量指标占比

研究类文章占比 OA被引用占比 撤稿占比 出版后修正文章占比
97.62%3.4%--

相关指数

影响因子
影响因子
年发文量
自引率
Cite Score

预警情况

查看说明
时间 预警情况
2025年03月发布的2025版不在预警名单中
2024年02月发布的2024版不在预警名单中
2023年01月发布的2023版不在预警名单中
2021年12月发布的2021版不在预警名单中
2020年12月发布的2020版不在预警名单中
*来源:中科院《 国际期刊预警名单》

JCR分区

WOS分区等级:Q3区
版本 按学科 分区
WOS期刊SCI分区
WOS期刊SCI分区
WOS期刊SCI分区是指SCI官方(Web of Science)为每个学科内的期刊按照IF数值排 序,将期刊按照四等分的方法划分的Q1-Q4等级,Q1代表质量最高,即常说的1区期刊。
(2024-2025年最新版)
ENGINEERING, INDUSTRIAL
Q3

中科院分区

查看说明
版本 大类学科 小类学科 Top期刊 综述期刊
2025年3月最新升级版
工程技术2区
STATISTICS & PROBABILITY 统计学与概率论
1区
ENGINEERING, INDUSTRIAL 工程:工业
2区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
2区
2023年12月升级版
工程技术2区
STATISTICS & PROBABILITY 统计学与概率论
1区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
2区
ENGINEERING, INDUSTRIAL 工程:工业
3区
2022年12月旧的升级版
工程技术2区
STATISTICS & PROBABILITY 统计学与概率论
2区
ENGINEERING, INDUSTRIAL 工程:工业
3区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
3区