International Journal of Industrial Engineering Computations

International Journal of Industrial Engineering Computations

INT J IND ENG COMP
影响因子:1.8
是否综述期刊:
是否预警:不在预警名单内
是否OA:
出版国家/地区:CANADA
出版社:GROWING SCIENCE
发刊时间:0
发刊频率:
收录数据库:SCIE/Scopus收录/DOAJ开放期刊
ISSN:1923-2926
年发文量 42
国人发稿量 24.39
国人发文占比 0.58%
自引率 -
平均录取率-
平均审稿周期 20 Weeks
版面费 -
偏重研究方向 Multiple-
期刊官网 http://growingscience.com/ijiec/ijiec.html
投稿链接

期刊高被引文献

A flexible mathematical model for the planning and designing of a sporting fixture by considering the assignment of referees
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.6.004
A hybrid algorithm for the multi-depot vehicle scheduling problem arising in public transportation
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2019.2.002
A mixed integer linear programming formulation for the vehicle routing problem with backhauls
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.6.003
A modified sailfish optimizer to solve dynamic berth allocation problem in conventional container terminal
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2019.4.002
来源期刊:DOI:
Consolidation centers in city logistics: A cooperative approach based on the location routing problem
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2019.1.001
A study of a kanban based assembly line feeding system through integration of simulation and particle swarm optimization
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.12.001
Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.2.002
Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.6.001
Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/j.ijiec.2018.11.001
Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.5.002
Trade-off in robustness, cost and performance by a multi-objective robust production optimization method
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.2.001
Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2019.4.001
Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.7.001
Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.6.005
Optimal placement of freight electric vehicles charging stations and their impact on the power distribution network
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/j.ijiec.2019.3.002
Aggregate simulation modeling with application to setting the CONWIP limit in a HMLV manufacturing cell
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.10.002
An integrated production-inventory model for deteriorating items to evaluate JIT purchasing alliances
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.5.001
Minimizing makespan in a three-stage hybrid flow shop with dedicated machines
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.10.001
Evolution of clustering techniques in designing cellular manufacturing systems: A state-of-art review
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/j.ijiec.2018.8.002
Flexible job-shop scheduling with learning and forgetting effect by Multi-Agent System
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2019.3.003
Estimating travel times in dual shuttle AS/RSs.: A revised approach
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.12.002
Stocking and price-reduction decisions for non-instantaneous deteriorating items under time value of money
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/J.IJIEC.2018.3.001
Constructing model robust mixture designs via weighted G-optimality criterion
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/j.ijiec.2019.4.004
Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study
来源期刊:International Journal of Industrial Engineering ComputationsDOI:10.5267/j.ijiec.2019.2.001

质量指标占比

研究类文章占比 OA被引用占比 撤稿占比 出版后修正文章占比
90.48%91.45%--

相关指数

影响因子
影响因子
年发文量
自引率
Cite Score

预警情况

查看说明
时间 预警情况
2025年03月发布的2025版不在预警名单中
2024年02月发布的2024版不在预警名单中
2023年01月发布的2023版不在预警名单中
2021年12月发布的2021版不在预警名单中
2020年12月发布的2020版不在预警名单中
*来源:中科院《 国际期刊预警名单》

JCR分区

WOS分区等级:Q3区
版本 按学科 分区
WOS期刊SCI分区
WOS期刊SCI分区
WOS期刊SCI分区是指SCI官方(Web of Science)为每个学科内的期刊按照IF数值排 序,将期刊按照四等分的方法划分的Q1-Q4等级,Q1代表质量最高,即常说的1区期刊。
(2024-2025年最新版)
ENGINEERING, INDUSTRIAL
Q3

中科院分区

查看说明
版本 大类学科 小类学科 Top期刊 综述期刊
2025年3月最新升级版
工程技术4区
ENGINEERING, INDUSTRIAL 工程:工业
4区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
4区
2023年12月升级版
工程技术3区
ENGINEERING, INDUSTRIAL 工程:工业
4区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
4区
2022年12月旧的升级版
工程技术3区
OPERATIONS RESEARCH & MANAGEMENT SCIENCE 运筹学与管理科学
3区
ENGINEERING, INDUSTRIAL 工程:工业
4区